PAUL STREET EAST
Sector : Student
Platform : Social Infrastructure
Site : Paul Street
City : Shoreditch, London, UK
Stage : Realised
Beds : 458
Value/GDV : £164,700,000
Completion : 2019
Contemporary student apartments in the heart of London’s creative, finance and innovation quarter
A 458 bed student accommodation scheme completed in August 2015. The development was carried out in a Joint Venture with McLaren Property. The completed building comprises two blocks of accommodation with interior-designed communal spaces and common rooms along with a landscaped central courtyard. The development also includes a 45,000 sq ft office building which was pre-sold. Paul Street was sold in April 2019.
Key aspects
Prime Shoreditch asset
The scheme comprised of two blocks of accommodation with interior-designed communal spaces and common rooms along with a landscaped central courtyard
The scheme included the development of a 45,000 sq ft office building which was pre-sold
CUMBERLAND PLACE
Sector : Student
Platform : Social Infrastructure
Site : Cumberland Place
City : Southampton, UK
Stage : Realised
Beds : 206
Value/GDV : £24,000,000
Completion : 2018
High specification student apartments located in Southampton city centre
The high specification scheme, located at 14 Cumberland Place, in Southampton city centre, comprises a mix of studios and two and three bed cluster flats over 12 storeys. The property includes a range of high quality interior designed dedicated communal facilities including study areas, 10th floor common room and sky deck, cinema and a gym. The site is located right in the city centre of Southampton, adjacent to and overlooking Watts Park. Nearby is the city’s main retail pitch and largest shopping centre, WestQuay, and Southampton Central train station. Cumberland Place was sold in December 2022.
PAUL STREET EAST
Sector : Student
Platform : Social Infrastructure
Site : Paul Street
City : Shoreditch, London, UK
Stage : Realised
Beds : 458
Value/GDV : £164,700,000
Completion : 2019
Contemporary student apartments in the heart of London’s creative, finance and innovation quarter
A 458 bed student accommodation scheme completed in August 2015. The development was carried out in a Joint Venture with McLaren Property. The completed building comprises two blocks of accommodation with interior-designed communal spaces and common rooms along with a landscaped central courtyard. The development also includes a 45,000 sq ft office building which was pre-sold. Paul Street was sold in April 2019.
Key aspects
Prime Shoreditch asset
The scheme comprised of two blocks of accommodation with interior-designed communal spaces and common rooms along with a landscaped central courtyard
The scheme included the development of a 45,000 sq ft office building which was pre-sold
PAUL STREET EAST
Sector : Student
Platform : Social Infrastructure
Site : Paul Street
City : Shoreditch, London, UK
Stage : Realised
Beds : 458
Value/GDV : £164,700,000
Completion : 2019
Contemporary student apartments in the heart of London’s creative, finance and innovation quarter
A 458 bed student accommodation scheme completed in August 2015. The development was carried out in a Joint Venture with McLaren Property. The completed building comprises two blocks of accommodation with interior-designed communal spaces and common rooms along with a landscaped central courtyard. The development also includes a 45,000 sq ft office building which was pre-sold. Paul Street was sold in April 2019.
Key aspects
Prime location in central Cambridge being in close proximity to both Anglia Ruskin and Cambridge Universities
The scheme included an attractive design led common room which opens directly onto the private courtyard
Cambridge is a significantly under-supplied market with a limited pipeline of planned schemes and a shortage of suitable sites supporting the ongoing demand/supply imbalance
PAUL STREET EAST
Sector : Student
Platform : Social Infrastructure
Site : Paul Street
City : Shoreditch, London, UK
Stage : Realised
Beds : 458
Value/GDV : £164,700,000
Completion : 2019
Contemporary student apartments in the heart of London’s creative, finance and innovation quarter
A 458 bed student accommodation scheme completed in August 2015. The development was carried out in a Joint Venture with McLaren Property. The completed building comprises two blocks of accommodation with interior-designed communal spaces and common rooms along with a landscaped central courtyard. The development also includes a 45,000 sq ft office building which was pre-sold. Paul Street was sold in April 2019.
Key aspects
Prime location in central Cambridge being in close proximity to both Anglia Ruskin and Cambridge Universities
The scheme included an attractive design led common room which opens directly onto the private courtyard
Cambridge is a significantly under-supplied market with a limited pipeline of planned schemes and a shortage of suitable sites supporting the ongoing demand/supply imbalance